Imkgift Ribbon _ Adhesive buckle belt cutting hook technology

1. Cutting hook operation of adhesive buckle belt
Press the start button of the delivery heat pipe and the horibbonok cutter first. After the heating heat pipe is preheated for 3 minutes, the belt can be introduced for thadhesivee hook cutter
And turn on the power supply of the conbelts是什么意思中文veyor motor, the normal frequency of the conveyor motor frequency band shall not exceed 39buckleylondonHZ
Every 2-3 hours or so, 2-3 drops of oil should be droppecutting matd on the hook cutter nozzle to reduce tool wear, and then through the orderadhesive hook of drum belt, and then check whether there are quality problems.cutting back
The problems found in the process ofbuckle翻译 cutting hook must be recorded iribbon负载均衡策略n the Process Quality Card of post-process Products, and signed after the cutting hook is completed, and filled in the Producuttingsction Record Form of cutting Hook.
Select a tool with similar adhesion force to cubelting唱法t all hooks in the same order and leave a version for samplribbons什么意思中文e check.
Ii. Work before the end of operation:
1. When stopping the machine, the heating tube should be removed from the top of the buckle belt first, then pcutting toolress the stop button of the feeding motor, and finally presstechnology怎么读英语 the scutting怎么读top button of the heatingtechnology是可数名词吗 tube and the cutting hook knife.
2. Pile the cut hooks in the area to be divided accordingcutting tool to specifications aadhesive layernd colorsribbon怎么读.
3. Do a good job of cleaning the machine and ittechnologys surroundadhesive wearings with the air blowing machine.
Matters needing attention:
1, boot must be in accordance with first turn on the hocutting shapeok cutter (heating tube) power supply and then turn on the trahookuphotshot124nsmission motor sequence, shutdown must beadhesive layer in accordance with first turntechnology怎么读 off the motor and then concern hookadhesive notes knife sequencadhesive layere, so as not to pull the hook tooth.
2. Before cutting the tape, see the setting timhooked是什么意思e of the adhesbuckleylondonive belt. The black and white hook shall be set 8 hours after the setting, the color belt shall be set 5 hours after the sbucklesetting, the 0.235 single wire shcuttingall be set 24 hours after theadhesive side settingadhesive test, the scutting翻译elf-adhesivbucklee tape shall be set 6 hours after the setting, and the soft fine hook shahook和verse的区别ll be setbuckle怎么读 8 hours after the setting.
3. When cutting the white belt, you can postpone refueling to avoid contamination.
4, thebuckleylondon procribbons什么意思中文ess of cutting hook can not be broken by jet blowing mtechnology什么意思中文achine.
Three, abnormal processing methods:
When the machine is abnormal, the power should be turned off immediately, and report to the immediate superior for solutions.
Dongguan IMkGIFT Ribbon Co., LTD., the brand name is IMkGIFT Riadhesive wearbbon, the worldhooked是什么意思‘s preferred clothing ingredientshookuphotshot124 supplier, referred to as WTH,adhesive是什么意思啊 Main all kinds of clothing, leather goods, handbags, shbuckle怎么读oes, packaging used in all kinds of ribbon, fastening belt, velvet belt, trademarks, elastic belt, tag, bag webbing, jacquard, printing, decoration, hair band, mushrooms, woven label, stickers, lace, ribbon, monofilament, etc. A lartechnology是什么意思英语ge number of new products, with the excelbuckles怎么读lcutting-edgeent quality and first-class service, drink praiscutting shapee at home and abroad mbeltsarket.
Official webadhesivelysite: http://www.mk.ayxvip.com

   Reminder    Flexible quality Options - start from scratch or adjust one of our designs to meet your needs. Expert Design Services - our friendly graphics specialists will create your vision with a custom proof. Fast Turnaround

   Contact us   

   All above product for your reference quality only ,Customize your logo Donot hesitate to inquiry   

   us : sales@ymkymk.com