What are the requirements for opening a lanyard factory and what are the equipment to be prepared
▼
Lanyard is now in great demand of the industry, whether it is mobile phone lanyard, or enterprises often order work brand lanyard, many application scenariorequirements翻译s, so now there are a lot of people want to enter the lawhatnyard inopeningsdustry share, so what are the conditionspreparedness for opening the lanyard factory?
If yourequirements翻译 want to open a lanyard factory, then you need to be elanyards什么意思quiwhatpped with the following equipment to meet the needs of the faequipment is not creditctory.factory中文意思
The equipment planning ofwhat怎么读 the whole plant is as follows:
Step 1: Purchase a warp machfactory什么意思中文翻译怎么读ine (a warp machine can be matched with 10~15 rope hangers)
Model: HXA140
Configuration: head +140 head yarn holder
Power: 220 v
1lanyard海词.5prepared翻译HPequipment和facility有什么区别 AC motor
Speed regulating device :2Hopenings是什么意思P inverter
Use: the PP yarn you bought from the raw materlanyard 是什么意思ial yarn factory (the PP yarn you bought back is a yarn and a yarn cylinder), will be dozens of PP yarn warped to the aluminum alloy panlanyard pull handle head. So there’s a lot of yawhatifrn on top of the updo. This step is to prepare the lanyard.
Pan head: aluminum alloy material, weight 8.2 kg a, generally speakinopening韩剧g, a machine to buy about 25.
Use: Container for warp yarn.
Supporting equipment: air compressor 2.5factory-producedHP+8mm air prequirements怎么读ipe
Step 2: Buy several rope hangers (also known as webbing machines)
Model: HXDV8/30.4/65.6/55
For example, 8/30.8 indicates the number of outgoing bandprepared翻译srequirement是什么意思中文, and 30 iwhateverndicequipment是可数名词吗ates the maximum bandwidth (mm) for each outgoing band
Power: 380V triaxial power, 1.5HP horsepower
Configuration: nose (12 pieces ofequipment brown frame)+21 position rearrequirements frame + standard accessequipment翻译ory.
Use: After warping this step, need to place 10~20 coipreparedstatement防止sql注入liopening怎么读ng heads full of PP yarn on the backlanyard 翻译 frame of high speed rope hanger. Then all the PP yarn on the hequipment是可数名词吗ead, Yongheng Rope Co., Ltdopening. on the dyeing rofactorydatareset是什么意思pe machine part of the higequipment和facility有什么区别h-end machfactorydatareset是什么意思ine is imported from Germany, Switzerland andrequirement是什么意思中文 thpreparedstatement防止sql注入e quality of the machine is guaropening韩剧anteed.
Step 3: Buy a winding mrequirements怎么读achine (a winding machine can be matched wiequipment是什么意思th ten rope hangers)
Model: HXIAI – 05
Powerwhatever: 380 v 0.5 HP
Use: After the rope is finished, it needs to be packaged into a coil by the windifactorybeanng machine for shirequirement是什么意思中文pment.
, of courseopening, these are just some of the basiopening怎么读c facilities, want to open a hang rope factory, requirement of still have a lot of, first, you must first have their own space, and then throughprepare的用法搭配 the local residents’ committees to sign to industriafactory复数形式怎么写l and commercial bureau registration, still had some big approval process, if you have doubts on this aspect, can inquire, we commequipment可数还是不可数unicate with progress in 15362037135
▼
Reminder Flexible quality Options - start from scratch or adjust one of our designs to meet your needs. Expert Design Services - our friendly graphics specialists will create your vision with a custom proof. Fast Turnaround
Contact us